Today’s rides, with more description:
The A ride route is down La Posta to Bondad, turn around, then thru Elmores corner via: Weaselskin bridge (CR214), US 550 to CR 302, to CO 172, CR 234 (Elmore’s Corner), to CR 240 up to Lemon (regroup). Back down CR 240 to N. College,Geoglein Gulch,back to Santa Rita Park.
The A ride is 68 miles long with 2749′ of climbing.
The B ride is the same as the A ride, except that they should make a left on CR 240 to omit the trip to Lemon.
The B ride is 49.5 miles long with 1837′ of climbing.
The C ride is an out and back on La Posta, returning via Hwy 3.
The C ride is 35 miles long with 814′ of climbing.
The routes can also be found on MapMyRide:
Ride safe,have fun!
Spencer